Parcel 014-181-09
Owners
USA ET AL
PAIUTE TRIBE OF YERINGTON
PAIUTE TRIBE OF YERINGTON
ATTN: BUREAU OF INDIAN AFF WNA
311 E WASHINGTON ST
CARSON CITY, NV 89701-4065
Parcel Summary
Location | CAMPBELL LN MASON VALLEY, NV |
---|---|
Use Code | 330: Five or More Units - Low Rise |
Tax District | 2.0: Mason Valley Fire Protection |
Map Parcel | FR SECS |
Acreage | 1136.6400 |
Exemptions | 361.050I: US GOVERNMENT TRIBAL LAND IN TRUST (100%) |
Plat Maps | 014-18.pdf (245kb) |
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $15,050,339 | $15,463,172 | $14,383,723 | $12,973,136 | $12,660,532 | $13,823,786 | $13,482,251 |
Total Extra Features Value | $1,086,839 | $1,161,372 | $1,073,345 | $966,998 | $972,448 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $1,704,960 | $1,704,960 | $1,704,960 | $1,704,960 | $1,704,960 | $1,704,971 | $1,704,971 |
Taxable Value | $17,842,138 | $18,329,504 | $17,162,028 | $15,645,094 | $15,337,940 | $15,528,757 | $15,187,223 |
Net Exemptions Value | $6,244,748 | $6,415,326 | $6,006,710 | $5,475,783 | $5,368,279 | $5,435,065 | $5,315,528 |
Net Assessed Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Instrument / Official Record | Date | Type | V/I | Dcl Value | Ownership |
---|---|---|---|---|---|
GBS 282254 | 2002-09-06 | GRANT BARGAIN SALE DEED | Vacant | $0 | Grantee: HEIM, LEONA & JEAN F (F16) |
GBS 276982 | 2002-05-16 | GRANT BARGAIN SALE DEED | Vacant | $0 | Grantee: BAILEY, RICHARD & RITA (F16) |
DED 29-045 | 1936-07-23 | DEED (OLD RECORDS) | Vacant | $0 |
Buildings
Building # 1, Section # 1, RESIDENCE 1100SF 1968, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 2, Section # 1, RESIDENCE 1100SF 1970, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 3, Section # 1, RESIDENCE 102 - 114 TABOOSI, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1200 | $162,644 | 2003 | 2003 | 0.00% | 33.00% | 67.00% | $108,971 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 440.00 |
Building # 4, Section # 1, RESIDENCE 1100SF, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 5, Section # 1, RESIDENCE 1100SF 1987, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 6, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 7, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 8, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 9, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 10, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 11, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 12, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 13, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 14, Section # 1, Created by Property Costing Estimate # 222546, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1968 | 1968 | 0.00% | 75.00% | 25.00% | $36,198 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 15, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 16, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 17, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 18, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 19, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 20, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 21, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 22, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 23, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 24, Section # 1, Created by Property Costing Estimate # 222547, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 25, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1970 | 1970 | 0.00% | 75.00% | 25.00% | $38,261 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 26, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $153,045 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $45,148 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0105 | Frame, Siding |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 27, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 28, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 29, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 30, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 31, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 32, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 33, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 34, Section # 1, Created by Property Costing Estimate # 222548, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 35, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 36, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 37, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 38, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 39, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 40, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 41, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 42, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 43, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 44, Section # 1, Created by Property Costing Estimate # 222549, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 45, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 46, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1978 | 1978 | 0.00% | 70.50% | 29.50% | $42,713 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 47, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 48, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 49, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 50, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 51, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 52, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 53, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 54, Section # 1, Created by Property Costing Estimate # 222550, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 55, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 56, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 57, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 58, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 59, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 60, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 61, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 62, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 63, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 64, Section # 1, Created by Property Costing Estimate # 222551, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 65, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 66, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 67, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 68, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 69, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 70, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 71, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 72, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 73, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 74, Section # 1, Created by Property Costing Estimate # 222552, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1987 | 1987 | 0.00% | 57.00% | 43.00% | $62,260 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 75, Section # 1, RESIDENCE 1100 SQ FT 1997, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 76, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 77, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 78, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 79, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 80, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 81, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 82, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 83, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 84, Section # 1, Created by Property Costing Estimate # 222553, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1100 | $144,791 | 1997 | 1997 | 0.00% | 42.00% | 58.00% | $83,979 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 7.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 |
Building # 85, Section # 1, RESIDENCE 1494 SQ FT, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1494 | $209,598 | 2006 | 2006 | 0.00% | 28.50% | 71.50% | $149,863 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0701 | Attached Garage | 430.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 86, Section # 1, Created by Property Costing Estimate # 222554, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1494 | $209,598 | 2006 | 2006 | 0.00% | 28.50% | 71.50% | $149,863 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0701 | Attached Garage | 430.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 87, Section # 1, Created by Property Costing Estimate # 222554, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1494 | $209,598 | 2006 | 2006 | 0.00% | 28.50% | 71.50% | $149,863 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0101 | Frame, Hardboard Sheets |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0701 | Attached Garage | 430.00 | |
0736 | Garage Finish, Attached (SF) | 430.00 | |
0904 | Slab Porch with Roof (SF) | 102.00 |
Building # 88, Section # 1, Created by Property Costing Estimate # 222554, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1200 | $162,644 | 2003 | 2003 | 0.00% | 33.00% | 67.00% | $108,971 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 440.00 |
Building # 89, Section # 1, Created by Property Costing Estimate # 222554, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1200 | $162,644 | 2003 | 2003 | 0.00% | 33.00% | 67.00% | $108,971 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 440.00 |
Building # 90, Section # 1, Created by Property Costing Estimate # 222554, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1200 | $162,644 | 2003 | 2003 | 0.00% | 33.00% | 67.00% | $108,971 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 440.00 |
Building # 91, Section # 1, Created by Property Costing Estimate # 222554, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1200 | $162,644 | 2003 | 2003 | 0.00% | 33.00% | 67.00% | $108,971 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 440.00 |
Building # 92, Section # 1, Created by Property Costing Estimate # 222554, Single Family Residence
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
RES | 01 | 1200 | $162,644 | 2003 | 2003 | 0.00% | 33.00% | 67.00% | $108,971 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0109 | Frame, Stucco |
HEAT | HEAT | 0309 | Forced Air Furnace |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 8.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
SBFL | SubFloor (RES) | 0622 | Raised Subfloor (%) |
0402 | Automatic Floor Cover Allowance | 1.00 | |
0736 | Garage Finish, Attached (SF) | 440.00 |
Building # 93, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 2832 | $173,632 | 1986 | 1986 | 0.00% | 58.50% | 41.50% | $72,057 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 80.00 | |
MBWD | Mobile Home Width | 28.00 |
Building # 94, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 2160 | $129,676 | 1986 | 1986 | 0.00% | 58.50% | 41.50% | $53,816 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 60.00 | |
MBWD | Mobile Home Width | 36.00 |
Building # 95, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 2680 | $177,581 | 1986 | 1986 | 0.00% | 58.50% | 41.50% | $73,696 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 67.00 | |
MBWD | Mobile Home Width | 40.00 |
Building # 96, Section # 1, MODULARS #1 OF 4, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 500 | $51,566 | 1975 | 1975 | 0.00% | 75.00% | 25.00% | $12,892 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 50.00 | |
MBWD | Mobile Home Width | 10.00 |
Building # 97, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 2880 | $186,657 | 1992 | 1992 | 0.00% | 49.50% | 50.50% | $94,262 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 72.00 | |
MBWD | Mobile Home Width | 40.00 |
Building # 98, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 2952 | $190,986 | 1992 | 1992 | 0.00% | 49.50% | 50.50% | $96,448 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 72.00 | |
MBWD | Mobile Home Width | 40.00 |
Building # 99, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 2880 | $186,657 | 1992 | 1992 | 0.00% | 49.50% | 50.50% | $94,262 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 72.00 | |
MBWD | Mobile Home Width | 40.00 |
Building # 100, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 2800 | $182,995 | 1992 | 1992 | 0.00% | 49.50% | 50.50% | $92,412 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 70.00 | |
MBWD | Mobile Home Width | 40.00 |
Building # 101, Section # 1, MODULARS, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 5230 | $356,756 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $169,459 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 80.00 | |
MBWD | Mobile Home Width | 38.00 |
Building # 102, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 2160 | $154,084 | 1986 | 1986 | 0.00% | 58.50% | 41.50% | $63,945 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 54.00 | |
MBWD | Mobile Home Width | 40.00 |
Building # 103, Section # 1, MODULAR, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 5424 | $329,133 | 1986 | 1986 | 0.00% | 58.50% | 41.50% | $136,590 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 80.00 | |
MBWD | Mobile Home Width | 40.00 |
Building # 104, Section # 1, Created by Property Costing Estimate # 222554, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 5230 | $356,756 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $169,459 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 80.00 | |
MBWD | Mobile Home Width | 38.00 |
Building # 105, Section # 1, Created by Property Costing Estimate # 222554, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 5230 | $356,756 | 1990 | 1990 | 0.00% | 52.50% | 47.50% | $169,459 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 80.00 | |
MBWD | Mobile Home Width | 38.00 |
Building # 106, Section # 1, MODULARS #2 OF 4, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 500 | $51,566 | 1975 | 1975 | 0.00% | 75.00% | 25.00% | $12,892 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 50.00 | |
MBWD | Mobile Home Width | 10.00 |
Building # 107, Section # 1, MODULARS #3 OF 4, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 500 | $51,566 | 1975 | 1975 | 0.00% | 75.00% | 25.00% | $12,892 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 50.00 | |
MBWD | Mobile Home Width | 10.00 |
Building # 108, Section # 1, MODULARS #4 OF 4, Mobile Home Real Property
Type | Model | Heated Sq Ft | Repl Cost New | YrBlt | WAY | Other % Dpr | Normal % Dpr | % Cond | Value |
---|---|---|---|---|---|---|---|---|---|
MRES | 06 | 500 | $51,566 | 1975 | 1975 | 0.00% | 75.00% | 25.00% | $12,892 |
Structural Elements
Type | Description | Code | Details |
---|---|---|---|
ROOF | ROOF | 0208 | Composition Shingle |
EW | EXT WALL | 0185 | Hardboard Sheet |
HEAT | HEAT | 0351 | Warmed & Cooled Air |
0502 | Automatic Appliance Allowance | 1.00 | |
0601 | Plumbing Fixtures -# | 10.00 | |
0602 | Plumbing Fixtures Rough-ins -# | 1.00 | |
0402 | Automatic Floor Cover Allowance | 1.00 | |
MBLN | Mobile Home Length | 50.00 | |
MBWD | Mobile Home Width | 10.00 |
Building # 109, Section # 1, GYMNASIUM 26,552SF, Gymnasium (School)
Building # 110, Section # 1, CLASS ROOMS, Manual Arts Bldg (School)
Building # 111, Section # 1, CLASS ROOMS, Manual Arts Bldg (School)
Building # 112, Section # 1, DORMITORY, Dormitory
Building # 113, Section # 1, DINING COMMONS, Commons (Schools)
Building # 114, Section # 1, DORMITORY, Dormitory
Building # 115, Section # 1, OFFICE/GYMNASIUM, Office Building
Building # 116, Section # 1, HEALTH CENTER, Medical Office
Building # 117, Section # 1, CHURCH, Church
Building # 118, Section # 1, ROP-CLASSRM, CAFETERIA, ADMIN, MEDICAL, Cafeteria
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
WTREATSM | WATER TREATMENT SML 200K-500K GPD 1/24 | 50000.00 | $10 | 1975 | $518,100 | 25% | $129,525 | $129,525 | ||
SH T21 | SHEDS TYPE 2 1=DIRT 2,3=CONCRETE 1/24 | 12 | 24 | 288.00 | $12 | 2007 | $3,496 | 73% | $2,552 | $2,552 |
CONCCS | COMP SHINGLE ROOF OVER CONCRETE 1/24 | 966.00 | $44 | 1998 | $42,436 | 60% | $25,249 | $25,249 | ||
SH T21 | SHEDS TYPE 2 1=DIRT 2,3=CONCRETE 1/24 | 12 | 24 | 288.00 | $12 | 2007 | $3,496 | 73% | $2,552 | $2,552 |
SH T21 | SHEDS TYPE 2 1=DIRT 2,3=CONCRETE 1/24 | 12 | 24 | 288.00 | $12 | 2007 | $3,496 | 73% | $2,552 | $2,552 |
DECK1 | DECK 1=SOFT 2=REDWOOD 3=TREX 1/24 | 632.00 | $15 | 1986 | $9,366 | 42% | $3,887 | $3,887 | ||
SH T21 | SHEDS TYPE 2 1=DIRT 2,3=CONCRETE 1/24 | 12 | 24 | 288.00 | $12 | 2007 | $3,496 | 73% | $2,552 | $2,552 |
SH T21 | SHEDS TYPE 2 1=DIRT 2,3=CONCRETE 1/24 | 12 | 24 | 288.00 | $12 | 2007 | $3,496 | 73% | $2,552 | $2,552 |
SH T21 | SHEDS TYPE 2 1=DIRT 2,3=CONCRETE 1/24 | 12 | 24 | 288.00 | $12 | 2007 | $3,496 | 73% | $2,552 | $2,552 |
WSP | WELL SEPTIC PRESSURE SYSTEM 1/24 | 10.00 | $16,501 | 1968 | $165,010 | 25% | $41,253 | $41,253 | ||
GPBLDG1 | GENERAL PURPOSE BLDG CONCRETE FL 1/24 | 100 | 100 | 10000.00 | $15 | 1980 | $154,100 | 33% | $50,083 | $50,083 |
SH T21 | SHEDS TYPE 2 1=DIRT 2,3=CONCRETE 1/24 | 12 | 24 | 288.00 | $12 | 2007 | $3,496 | 73% | $2,552 | $2,552 |
DECKCS | COMP SHINGLE ROOF OVER DECK 1/24 | 5 | 40 | 200.00 | $43 | 1986 | $8,631 | 42% | $3,582 | $3,582 |
SHEDS3 | SHEDS TYPE 1 1=DIRT 2,3=CONCRETE 1/24 | 16 | 54 | 864.00 | $24 | 1996 | $21,142 | 57% | $11,945 | $11,945 |
SH T21 | SHEDS TYPE 2 1=DIRT 2,3=CONCRETE 1/24 | 12 | 24 | 288.00 | $12 | 2007 | $3,496 | 73% | $2,552 | $2,552 |
CONCAL | ALUMINUM AWNING OVER CONCRETE 1/24 | 8 | 24 | 192.00 | $27 | 2007 | $5,178 | 73% | $3,780 | $3,780 |
RCHLKTR | RURAL CH LINK W/TOP RAIL 3=8' 4=12' 1/24 | 9000.00 | $21 | 1987 | $191,414 | 43% | $82,308 | $82,308 | ||
GPBLDG2 | GENERAL PURPOSE BLDG CONCRETE FL 1/24 | 1084.00 | $19 | 2007 | $20,842 | 73% | $15,215 | $15,215 | ||
CONCRETE | CONCRETE OVER 1500 SQ FT 1/24 | 25000.00 | $7 | 1978 | $181,250 | 30% | $53,469 | $53,469 | ||
CONCAL | ALUMINUM AWNING OVER CONCRETE 1/24 | 2000.00 | $34 | 1995 | $67,425 | 55% | $37,084 | $37,084 | ||
HAY ST1 | HAY STORAGE BARN DIRT FLOOR 1/24 | 28 | 45 | 1260.00 | $21 | 2007 | $26,260 | 73% | $19,170 | $19,170 |
SEPTIC | SEPTIC 1250 GAL M&S X 1.25 PRO 1/24 | 76.00 | $4,474 | 1979 | $340,024 | 31% | $105,407 | $105,407 | ||
SHEDS2 | SHEDS TYPE 1 1=DIRT 2,3=CONCRETE 1/24 | 8 | 10 | 80.00 | $31 | 1995 | $2,493 | 55% | $1,371 | $1,371 |
SEPTIC | SEPTIC 1250 GAL M&S X 1.25 PRO 1/24 | 10.00 | $4,474 | 1997 | $44,740 | 58% | $25,949 | $25,949 | ||
SEPTIC | SEPTIC 1250 GAL M&S X 1.25 PRO 1/24 | 3.00 | $4,474 | 2006 | $13,422 | 72% | $9,597 | $9,597 | ||
CONCCS | COMP SHINGLE ROOF OVER CONCRETE 1/24 | 4 | 12 | 48.00 | $27 | 1992 | $1,309 | 51% | $661 | $661 |
GAR HB1 | DETACHED GARAGE HARDBOARD 1/24 | 20 | 40 | 800.00 | $32 | 1985 | $25,696 | 40% | $10,278 | $10,278 |
GAR HB2 | DETACHED GARAGE HARDBOARD 1/24 | 24 | 24 | 576.00 | $39 | 1988 | $22,180 | 45% | $9,870 | $9,870 |
GPBLDG1 | GENERAL PURPOSE BLDG CONCRETE FL 1/24 | 20 | 30 | 600.00 | $19 | 1989 | $11,309 | 46% | $5,202 | $5,202 |
DECK1 | DECK 1=SOFT 2=REDWOOD 3=TREX 1/24 | 256.00 | $15 | 1992 | $3,794 | 51% | $1,916 | $1,916 | ||
SHEDS2 | SHEDS TYPE 1 1=DIRT 2,3=CONCRETE 1/24 | 10 | 20 | 200.00 | $26 | 1992 | $5,266 | 51% | $2,659 | $2,659 |
TENNIS | TENNIS COURT W/NET,STRIPING EACH 1/24 | 2.00 | $52,428 | 1992 | $104,857 | 51% | $52,953 | $52,953 | ||
GAR HB1 | DETACHED GARAGE HARDBOARD 1/24 | 20 | 24 | 480.00 | $35 | 1985 | $16,661 | 40% | $6,664 | $6,664 |
GAR HB2 | DETACHED GARAGE HARDBOARD 1/24 | 24 | 36 | 864.00 | $37 | 2006 | $31,683 | 72% | $22,653 | $22,653 |
ASPH2 | ASPHALT "FAIR" AND "GOOD" 1/24 | 22400.00 | $2 | 1992 | $42,784 | 51% | $21,606 | $21,606 | ||
CRPTSH | CARPORT WITH SHED ROOF W/SLAB 1/24 | 10 | 20 | 200.00 | $22 | 1985 | $4,410 | 40% | $1,764 | $1,764 |
GPBLDG1 | GENERAL PURPOSE BLDG CONCRETE FL 1/24 | 1028.00 | $18 | 1988 | $18,263 | 45% | $8,127 | $8,127 | ||
DECKCS | COMP SHINGLE ROOF OVER DECK 1/24 | 676.00 | $43 | 1986 | $29,171 | 42% | $12,106 | $12,106 | ||
GPBLDG1 | GENERAL PURPOSE BLDG CONCRETE FL 1/24 | 24 | 30 | 720.00 | $18 | 1988 | $13,154 | 45% | $5,854 | $5,854 |
DECK2 | DECK 1=SOFT 2=REDWOOD 3=TREX 1/24 | 8 | 10 | 80.00 | $35 | 1990 | $2,777 | 48% | $1,319 | $1,319 |
SEPTIC | SEPTIC 1250 GAL M&S X 1.25 PRO 1/24 | 6.00 | $4,474 | 2003 | $26,844 | 67% | $17,985 | $17,985 | ||
DECKCS | COMP SHINGLE ROOF OVER DECK 1/24 | 4 | 54 | 216.00 | $43 | 1986 | $9,321 | 42% | $3,868 | $3,868 |
SHEDS2 | SHEDS TYPE 1 1=DIRT 2,3=CONCRETE 1/24 | 8 | 10 | 80.00 | $31 | 1992 | $2,493 | 51% | $1,259 | $1,259 |
SHEDS3 | SHEDS TYPE 1 1=DIRT 2,3=CONCRETE 1/24 | 16 | 18 | 288.00 | $34 | 1992 | $9,738 | 51% | $4,918 | $4,918 |
BLEACHP | PORTABLE BLEACHERS METAL FRAME 1/24 | 600.00 | $30 | 1992 | $18,222 | 51% | $9,202 | $9,202 | ||
RCHLKTRB | RURAL CH LINK W/TR BARB 3=8' 4=12' 1/24 | 3000.00 | $25 | 1994 | $73,525 | 54% | $39,336 | $39,336 | ||
WELL | WELL 150'D 6"DIA RURAL 1/24 | 1.00 | $8,850 | 1986 | $8,850 | 42% | $3,673 | $3,673 | ||
SEPTIC | SEPTIC 1250 GAL M&S X 1.25 PRO 1/24 | 4.00 | $4,474 | 1986 | $17,896 | 42% | $7,427 | $7,427 | ||
CONCRETE | CONCRETE OVER 1500 SQ FT 1/24 | 25000.00 | $7 | 1992 | $181,250 | 51% | $91,531 | $91,531 | ||
SPRINKSM | SPRINKLERS RES SMALL COMMERCIAL 1/24 | 25000.00 | $1 | 1992 | $34,535 | 51% | $17,440 | $17,440 | ||
LATTMTC | HIGH END OPEN OVER CONCRETE 1/24 | 14 | 22 | 308.00 | $80 | 2013 | $24,538 | 82% | $20,121 | $20,121 |
LATTMTC | HIGH END OPEN OVER CONCRETE 1/24 | 14 | 22 | 308.00 | $80 | 2013 | $24,538 | 82% | $20,121 | $20,121 |
LATTMTC | HIGH END OPEN OVER CONCRETE 1/24 | 12 | 18 | 216.00 | $66 | 2013 | $14,340 | 82% | $11,759 | $11,759 |
LATTMTC | HIGH END OPEN OVER CONCRETE 1/24 | 12 | 18 | 216.00 | $66 | 2013 | $14,340 | 82% | $11,759 | $11,759 |
LATTMTC | HIGH END OPEN OVER CONCRETE 1/24 | 12 | 18 | 216.00 | $66 | 2013 | $14,340 | 82% | $11,759 | $11,759 |
LATTMTC | HIGH END OPEN OVER CONCRETE 1/24 | 12 | 18 | 216.00 | $66 | 2013 | $14,340 | 82% | $11,759 | $11,759 |
Land Lines
Personal Property
Account | Secured/ Unsecured | Owner | Description |
---|---|---|---|
MH008691 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH010183 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH010184 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH010185 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH010186 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH010308 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH010309 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH010310 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH010311 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
MH011047 | Unsecured | EMM, ELWOOD L JR | MH - MOBILE HOMES |
MH011048 | Unsecured | EMM, ELWOOD L JR | MH - MOBILE HOMES |
MH011049 | Unsecured | TOM, DON | MH - MOBILE HOMES |
MH011050 | Unsecured | ROBERTS, JOSHUA MICHAEL | MH - MOBILE HOMES |
MH011051 | Unsecured | JOHNSON, LORRAINE | MH - MOBILE HOMES |
MH011052 | Unsecured | EMM, ELWOOD L JR | MH - MOBILE HOMES |
MH011216 | Unsecured | RITE OF PASSAGE | MH - MOBILE HOMES |
Disclaimer
All parcel data on this page is for use by the Lyon County Property Appraiser for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Lyon County Assessor's Office as of January 10, 2025.