Parcel 001-031-01
Owners
YERINGTON, CITY OF
14 E GOLDFIELD AVE
YERINGTON, NV 89447-0000
Parcel Summary
Location | 130 E GOLDFIELD AVE YERINGTON, NV |
---|---|
Use Code | 900: Parks for Public Use |
Tax District | 1.0: City of Yerington |
Acreage | 16.0000 |
Exemptions | 361.060B: CONSERVATION DISTRICT (PURSUANT TO 548.393) (100%) |
Plat Maps | 001-03.pdf (393kb) |
Additional Site Addresses
625 N OREGON ST
Value History
2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|---|
Total Building Value | $0 | $0 | $0 | $0 | $0 | $318,620 | $309,003 |
Total Extra Features Value | $367,231 | $382,528 | $350,846 | $307,747 | $308,604 | $0 | $0 |
Total Secured Pers Prop | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Total Land Value | $188,179 | $188,179 | $188,179 | $188,179 | $188,179 | $188,171 | $188,171 |
Taxable Value | $555,410 | $570,707 | $539,025 | $495,926 | $496,783 | $506,791 | $497,174 |
Net Exemptions Value | $194,394 | $199,747 | $188,659 | $173,574 | $173,874 | $177,377 | $174,011 |
Net Assessed Value | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Improvements | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
New Land | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Document/Transfer/Sales History
Instrument / Official Record | Date | Type | V/I | Dcl Value | Ownership |
---|---|---|---|---|---|
QCD 24768 | 1975-12-23 | QUITCLAIM DEED | Vacant | $0 | Grantee: CITY OF YERINGTON |
COR 24145 | 1975-11-25 | CORRECTION DEED/DOCUMENT | Vacant | $0 | Grantee: STATE OF NEVADA |
DEE 17988 | 1974-03-14 | DEED | Vacant | $0 | Grantee: LYON CO SCHOOL BOARD |
Buildings
None
Extra Features
Code | Description | Length | Width | Units | Unit Price | AYB | Repl Cost | % Good Condition | Dpr Value* | Final Value |
---|---|---|---|---|---|---|---|---|---|---|
CHLKTR2 | CH LINK TOP RAIL 1=3' 2=4' 3=6' 4=8'1/24 | 450.00 | $19 | 1982 | $8,375 | 36% | $2,973 | $2,973 | ||
SNACKCB | SNACK BAR BLOCK 3=SPACE HEAT 1/24 | 280.00 | $119 | 1965 | $33,309 | 25% | $8,327 | $8,327 | ||
CHLKTR2 | CH LINK TOP RAIL 1=3' 2=4' 3=6' 4=8'1/24 | 1000.00 | $18 | 1982 | $17,633 | 36% | $6,260 | $6,260 | ||
SNACKCB | SNACK BAR BLOCK 3=SPACE HEAT 1/24 | 294.00 | $119 | 1978 | $34,974 | 30% | $10,317 | $10,317 | ||
TENNIS | TENNIS COURT W/NET,STRIPING EACH 1/24 | 3.00 | $61,914 | 1975 | $185,743 | 25% | $46,436 | $46,436 | ||
SPRINKLG | SPRINKLERS LARGE AREA COMMERCIAL 1/24 | 50000.00 | $1 | 1987 | $38,830 | 43% | $16,697 | $16,697 | ||
SPRINKLG | SPRINKLERS LARGE AREA COMMERCIAL 1/24 | 32500.00 | $1 | 1975 | $25,240 | 25% | $6,310 | $6,310 | ||
BUNK4 | BUNKHOUSES 80% CRPT,20% LINO,INSUL 1/24 | 494.00 | $87 | 1978 | $42,861 | 30% | $12,644 | $12,644 | ||
CONCRETE | CONCRETE OVER 1500 SQ FT 1/24 | 1620.00 | $7 | 1989 | $11,745 | 46% | $5,403 | $5,403 | ||
RFROLL | ROLLED ROOF COVER DIRT FLOOR 1/24 | 200.00 | $19 | 1965 | $3,768 | 25% | $942 | $942 | ||
CONCRETE | CONCRETE OVER 1500 SQ FT 1/24 | 372.00 | $7 | 1975 | $2,697 | 25% | $674 | $674 | ||
BLEACHER | OPEN METAL FRAME AVG PER SQ FT 1/24 | 640.00 | $55 | 1978 | $35,367 | 30% | $10,433 | $10,433 | ||
SNACKCB | SNACK BAR BLOCK 3=SPACE HEAT 1/24 | 834.00 | $119 | 1988 | $99,213 | 45% | $44,150 | $44,150 | ||
BNK3/44 | BUNKHOUSES 3/4 COST COMMON WALL 1/24 | 306.00 | $68 | 1965 | $20,799 | 25% | $5,200 | $5,200 | ||
SANDBOX | PLAYGROUND EQUIPMENT 1/24 | 1.00 | $1,520 | 1989 | $1,520 | 46% | $699 | $699 | ||
TENNISF | TENNIS COURT FENCING EACH 1/24 | 2.00 | $16,580 | 1978 | $33,160 | 30% | $9,782 | $9,782 | ||
BACKSTOP | BASEBALL 1,2=HOOD 3,4=ARCH 1/24 | 1.00 | $13,812 | 1988 | $13,812 | 45% | $6,146 | $6,146 | ||
BLEACHER | OPEN METAL FRAME AVG PER SQ FT 1/24 | 640.00 | $55 | 1965 | $35,367 | 25% | $8,842 | $8,842 | ||
CHLKTR2 | CH LINK TOP RAIL 1=3' 2=4' 3=6' 4=8'1/24 | 470.00 | $19 | 1978 | $8,747 | 30% | $2,580 | $2,580 | ||
MODPLAY | MODULAR PLAY SYSTEMS COMPLETE EACH 1/24 | 1.00 | $16,507 | 1989 | $16,507 | 46% | $7,593 | $7,593 | ||
CHLKTR3 | CH LINK TOP RAIL 1=3' 2=4' 3=6' 4=8'1/24 | 863.00 | $25 | 1965 | $21,275 | 25% | $5,319 | $5,319 | ||
CONCCS | COMP SHINGLE ROOF OVER CONCRETE 1/24 | 200.00 | $23 | 1978 | $4,531 | 30% | $1,337 | $1,337 | ||
CONCRETE | CONCRETE OVER 1500 SQ FT 1/24 | 1500.00 | $7 | 1989 | $10,875 | 46% | $5,003 | $5,003 | ||
CONCRR | ROLLED ROOF OVER CONCRETE 1/24 | 6 | 20 | 120.00 | $43 | 1994 | $5,220 | 54% | $2,792 | $2,792 |
TENNISL | LIGHTING FOR TENNIS COURT EACH 1/24 | 2.00 | $18,848 | 1978 | $37,696 | 30% | $11,120 | $11,120 | ||
BLEACHER | OPEN METAL FRAME AVG PER SQ FT 1/24 | 640.00 | $55 | 1994 | $35,367 | 54% | $18,921 | $18,921 | ||
BBHOOP | BASKETBALL HOOP W/POLE 1/24 | 2.00 | $1,755 | 1989 | $3,511 | 46% | $1,615 | $1,615 | ||
LIGHTMV | LIGHT FIXTURE MERCURY VAPOR 1/24 | 25.00 | $1,430 | 1978 | $35,753 | 30% | $10,547 | $10,547 | ||
LIGHTMV | LIGHT FIXTURE MERCURY VAPOR 1/24 | 25.00 | $1,430 | 1965 | $35,753 | 25% | $8,938 | $8,938 | ||
SCOREBD1 | FLUSH MOUNT PER SQ FT FACE 1/24 | 5 | 10 | 50.00 | $101 | 1965 | $5,057 | 25% | $1,264 | $1,264 |
SPRINKLG | SPRINKLERS LARGE AREA COMMERCIAL 1/24 | 63138.00 | $1 | 1978 | $49,033 | 30% | $14,465 | $14,465 | ||
FNC L | FENCE "LOW" 100' 1/24 | 1.00 | $2,040 | 1994 | $2,040 | 54% | $1,091 | $1,091 | ||
CONC G | CONCRETE "GOOD" 1350SF 1/24 | 1.00 | $9,790 | 1994 | $9,790 | 54% | $5,238 | $5,238 | ||
PASYSTEM | SOUND SYSTEM BASE COST 1/24 | 1.00 | $1,279 | 1978 | $1,279 | 30% | $377 | $377 | ||
SPRINKLG | SPRINKLERS LARGE AREA COMMERCIAL 1/24 | 44000.00 | $1 | 1965 | $34,170 | 25% | $8,543 | $8,543 | ||
POLE24 | LIGHT POLE 24'H YARD LIGHTING 1/24 | 25.00 | $2,231 | 1965 | $55,767 | 25% | $13,942 | $13,942 | ||
DRINKST | DRINKING FOUNTAIN STEEL 1/24 | 4.00 | $3,032 | 1978 | $12,128 | 30% | $3,578 | $3,578 | ||
CHGATE3 | CH LINK GATE 3'W 1=4'H 2=6' 3=8' 1/24 | 8.00 | $513 | 1978 | $4,106 | 30% | $1,211 | $1,211 | ||
PASYSTEM | SOUND SYSTEM BASE COST 1/24 | 1.00 | $1,279 | 1965 | $1,279 | 25% | $320 | $320 | ||
BACKSTOP | BASEBALL 1,2=HOOD 3,4=ARCH 1/24 | 2.00 | $5,312 | 1978 | $10,625 | 30% | $3,134 | $3,134 | ||
PASPEAK | PER SPEAKER PAGING-1&2 MUSIC=3&4 1/24 | 3.00 | $129 | 1965 | $386 | 25% | $97 | $97 | ||
GAR HB3 | DETACHED GARAGE HARDBOARD 1/24 | 24 | 36 | 864.00 | $41 | 1993 | $35,381 | 52% | $18,398 | $18,398 |
FIXT 4 | FIXTURES FOR CLASS 4 BLDGS 1/24 | 1.00 | $3,416 | 1978 | $3,416 | 30% | $1,008 | $1,008 | ||
POLE24 | LIGHT POLE 24'H YARD LIGHTING 1/24 | 25.00 | $2,231 | 1978 | $55,767 | 30% | $16,451 | $16,451 | ||
PASPEAK | PER SPEAKER PAGING-1&2 MUSIC=3&4 1/24 | 3.00 | $129 | 1978 | $386 | 30% | $114 | $114 |
Land Lines
Personal Property
None
Disclaimer
All parcel data on this page is for use by the Lyon County Property Appraiser for assessment purposes only. The summary data on this page may not be a complete representation of the parcel or of the improvements thereon. Building information, including unit counts and number of permitted units, should be verified with the appropriate building and planning agencies. Zoning information should be verified with the appropriate planning agency. All parcels are reappraised each year. This is a true and accurate copy of the records of the Lyon County Assessor's Office as of January 10, 2025.